Question?

770-431-7300 (Commercial)

470-870-7733 (Residential)

Project Profile · Residential Development

Fiddlers Landing CBU & Mail Kiosk Cover

Mitchell Metals fabricated and installed a 7-box cantilever CBU cover measuring 8' x 23' 2" in Bronze on 6x6 extruded aluminum posts and beams at Fiddlers Landing, a D.R. Horton community in Winston-Salem, North Carolina.
  • CBU Canopy
  • Cantilever
  • 7-Box
  • Bronze
  • 6x6 Posts & Beams
  • Winston-Salem, NC
The completed 7-box cantilever mail center at Fiddlers Landing, Winston-Salem, NC.
Community
Fiddlers Landing
Builder
D.R. Horton
Location
Winston-Salem, North Carolina
Structure
8' x 23' 2"
In short

Mitchell Metals supplied and installed a 7-box cantilever CBU cover at Fiddlers Landing in Winston-Salem, North Carolina, for D.R. Horton. The structure measures 8′ x 23′ 2″ in Bronze on 6×6 extruded aluminum posts and beams. It is one of the first two pre-engineered CBU covers Mitchell Metals has completed for the D.R. Horton Greensboro division.

Overview

Two communities, one opening move

Fiddlers Landing is a D.R. Horton community in Winston-Salem, North Carolina. Its mail center went in alongside a second one at Aspen Place, and together they are the first two pre-engineered CBU covers Mitchell Metals has completed for the D.R. Horton Greensboro division.

Starting with two at once is unusual, and it was deliberate on both sides. The D.R. Horton Greensboro team took the pre-engineered model at face value from the first conversation, which meant we could run both communities through planning, submittal, and installation on the same track instead of treating each as a one-off.

What pre-engineered actually buys a builder

A custom canopy has to be designed, engineered, stamped, reviewed, and revised before anyone orders aluminum. That cycle is measured in weeks, and it happens at the end of a development when the schedule has the least slack left in it.

A pre-engineered cover skips the cycle. The spans, connections, and load ratings are already established, so the questions left are which configuration, how many boxes, and what color. Pricing is known earlier, submittals move faster, and fabrication starts without waiting on an engineering round. That is what the D.R. Horton Greensboro team leaned into, and it is why two communities could open together rather than one after the other.

Why cantilever here

Both covers are cantilever structures: the roof is carried on a single line of 6×6 posts set behind the cluster box units, leaving the entire approach side clear. Residents walk straight up to the boxes with nothing in the way, carriers can service the units without working around a post, and the structure tucks against a curb or a narrow pad in a way a post-on-both-sides canopy cannot.

Fiddlers Landing is the shorter of the two runs — seven cluster box units across just over 23 feet. Same profile, same finish, same details as Aspen Place, sized to a smaller door count. That is what pre-engineered means in practice: the system scales without being redesigned.

Both are extruded aluminum, so nothing on either structure rusts. Both are engineered to ASCE 7-16 wind and snow loads and designed to meet ADA and IBC requirements, with cluster box placement following the USPS Builders/Developers Guide.

Project Partners

Who we worked with

Home Builder
D.R. Horton, Inc.

The largest homebuilder in the United States by volume, founded in 1978 and having built more than one million homes. The D.R. Horton Greensboro division builds across the North Carolina Piedmont Triad.

D.R. Horton Greensboro Team
Cale Jordan, Otis Garrett and Marty Jones

Our points of contact at D.R. Horton Greensboro across both Fiddlers Landing and Aspen Place. Mitchell Metals coordinated planning, submittals, and installation for both communities through their team.

Manufacturer & Installer
Mitchell Metals, LLC

Headquartered in Marietta, Georgia, Mitchell Metals engineers and fabricates pre-engineered aluminum canopy systems in-house and delivers CBU mail centers, picnic pavilions, bus stop covers, and amenity covers as complete turnkey packages.

Mitchell Metals values partnerships as much as the products we provide. Our thanks to Charlene Zacha and the Toll Brothers Oregon and SW Washington Division team.

Project Specifications

What was installed at Fiddlers Landing

Fiddlers Landing CBU cover — as-built specifications
Project nameFiddlers Landing
LocationWinston-Salem, Forsyth County, North Carolina
Builder / developerD.R. Horton — D.R. Horton Greensboro
Market segmentResidential — single-family development
ProductPre-engineered CBU mail kiosk cover
Canopy configurationCantilever
Mailbox capacity7-box cantilever CBU
Canopy dimensions8' x 23' 2"
Finish colorBronze
Posts6x6 extruded aluminum
Beams6x6 extruded aluminum
Engineering standardRated for ASCE 7-16 wind & snow loads
ComplianceADA & IBC compliant; USPS Builders/Developers Guide

Why these specs were chosen

Cantilever configuration. Posts on one side only. The approach stays clear for residents and carriers, and the structure sits comfortably against a drive or a narrow pad where a two-sided canopy would not.

8′ x 23′ 2″. Sized to 7-box cluster box units in a single continuous run, at the standard 8-foot cover depth.

6×6 extruded aluminum posts and beams. A heavier profile than the minimum required, chosen for durability and for the visual weight it gives a structure this long. Extruded aluminum means nothing on the frame rusts.

Bronze finish. A factory-applied finish that holds color, hides road dust and pollen better than lighter finishes, and coordinates with the dark exterior hardware common on new residential construction.

Project Gallery

Fiddlers Landing, Winston-Salem, NC

Questions

Frequently asked questions about this project

Mitchell Metals, LLC of Marietta, Georgia manufactured and installed the pre-engineered CBU cover at Fiddlers Landing. The structure is a 7-box cantilever CBU cover measuring 8′ x 23′ 2″ in Bronze on 6×6 extruded aluminum posts and beams.

Fiddlers Landing is a D.R. Horton community in Winston-Salem, Forsyth County, North Carolina, built by the D.R. Horton Greensboro division. D.R. Horton, Inc. is the largest homebuilder in the United States by volume and has built more than one million homes since 1978.

The structure is a 7-box cantilever CBU cover measuring 8′ x 23′ 2″, finished in Bronze. Posts and beams are 6×6 extruded aluminum. It is rated for ASCE 7-16 wind and snow loads and designed to meet ADA and IBC requirements, with cluster box placement following the USPS Builders/Developers Guide.

A cantilever CBU cover carries its roof on a single line of posts set behind the cluster box units, so the entire approach side is clear of structure. Residents and mail carriers walk straight up to the boxes with no post in the way, and the open side makes the structure easier to place against a curb or a narrow pad. It is the configuration to choose when the mail center sits along a drive or walk rather than in an open island.

A pre-engineered cover is built from a standard, already-engineered aluminum canopy system rather than designed from scratch for each site. The spans, connections, and load ratings are established, so submittals move faster, pricing is known earlier, and fabrication starts without waiting on a custom engineering cycle. The system still scales — the same details cover a 7-box run or a 14-box run.

Yes. Mitchell Metals is headquartered in Marietta, Georgia and serves home builders, land developers, general contractors, and architects across the Southeast, including Winston-Salem and the wider Greensboro, Winston-Salem, and High Point area. Call 470-870-7733 for residential projects.

Planning amenities for your next community?

Send us your site plan and unit count. Our pre-engineered covers price fast, submit fast, and ship without waiting on a custom engineering cycle.